Capital Facilities Projects
The Public Works Department has a number of projects either under assessment, in the design phase, or currently under construction. The following report lists some of those projects. For a complete list please contact Public Works. Capital Improvements Map (requires Adobe Acrobat Reader)

2008 Projects
2007 Projects
Sheridan Pathways Mater Plan Final Report May 2007, click to view PDF file, Right Click and Save as to download
This is an 18 MB File
An Update to the Original 1997 Sheridan Pathways Project Master Plan.
An Update to the Original 1997 Sheridan Pathways Project Master Plan.
2006 Projects
Sumner Street Reconstruction Project
River Walk Project
Big Goose Pipeline Project
Septic System Impact Study
River Walk Project
Big Goose Pipeline Project
Septic System Impact Study
Final Report(1.9mb)
Figure 2.1(1.8mb)
Figure 2.2(1.9mb)
Figure 2.3(1.9mb)
Figure 2.4(2.6mb)
Figure 2.5(2.1mb)
Figure 2.6(2.4mb)
Figure 2.7(2.4mb)
Executive Summary(301kb)
Executive Summary Figure(2.4mb)
Study can also be found here at the Sheridan County Conservation District WEB Page
Figure 2.1(1.8mb)
Figure 2.2(1.9mb)
Figure 2.3(1.9mb)
Figure 2.4(2.6mb)
Figure 2.5(2.1mb)
Figure 2.6(2.4mb)
Figure 2.7(2.4mb)
Executive Summary(301kb)
Executive Summary Figure(2.4mb)
Study can also be found here at the Sheridan County Conservation District WEB Page
2005 Projects
Latest News
(click here for all Projects Division news releases...)
(02/11/2008) : Transportation Planning
Sheridan Transportation Planning Study
(01/25/2008) : CITY OF SHERIDAN PUBLIC WORKS DIRECTOR TO STEP DOWN
Rod Leisinger announced Thursday afternoon that he's stepping down from his position at the end of June this year.
(click here for all Public Works Dept. news releases...)



About Sheridan's Recycling Program?

